Overview & specifications
U3-format hydro blocks consolidate multiple S21-generation modules behind shared plumbing—ideal for megawatt rows where civil, structural, and hydraulic design are engineered together. Treat skids as building systems, not oversized miners: lifting lugs, seismic anchorage, and harmonic filtering all belong on the drawing set.
Delivery readiness
- Confirm crane charts against laydown pad compaction tests.
- Route fiber and coolant sleeves on separate trays to avoid cross-risk.
- Hold joint commissioning between EPC, OEM, and pool operations.
Use illustrative charts for exec summaries; attach factory FAT curves for investors.
Pricing & ordering
| Reference list price | $9,299.00 |
|---|---|
| Tiers, Incoterms & notes | Public list price is a reference only. Batch/volume bands and contractual language must be re-keyed from your authorized distributor quote. Commercial terms: The list price shown here is a reference only. Volume tiers, Incoterms, payment milestones, factory lead times, and final serial-matched specs must come from your written quotation or distributor acknowledgement—not from third-party marketing pages. Performance charts: Add PNG, JPEG, WebP, or SVG exports (e.g. hashrate or efficiency vs. inlet temperature) under |
Specifications
| SKU | BM-9E516940A5 |
|---|
Performance & curves
Reference charts bundled with this catalog folder. Open any image for full resolution; values are indicative until confirmed on your quote.
Operations & deployment
Plan rack or shelf loading, cable management, and thermal containment before arrival. Mining hardware ships at high density—verify floor loading, PDU headroom, and fire-system suitability with your building engineer. SHA-256 systems exhaust substantial heat; maintain cold-aisle discipline and staged firmware rollout on a bench host before production.
- Run burn-in on clean power with logging before joining high-value pools.
- Document serials, batch codes, and receipt photos for warranty and insurance.
- Maintain spare fans, cables, and controller boards where lead times are volatile.
Ordering, logistics & compliance
Commercial terms, Incoterms, VAT/GST treatment, and import classification are quoted per order. Freight may require fork-truck offload, liftgate service, or customs brokerage depending on lane and carton weight.
- Lead times and allocations change with fab schedules—confirm on the written order acknowledgement.
- End-use and sanctions screening may apply; customers are responsible for lawful deployment.
- Returns are handled per warranty policy; cosmetic tolerance varies by transport mode.
Support & warranty orientation
Manufacturer warranty windows, RMA paths, and advance replacement rules are defined on your invoice and manufacturer policy. Keep packaging for DOA claims when required.






Reviews
There are no reviews yet.