Overview & specifications
U3 clusters around S23 silicon push per-row terahash further, magnifying hydraulic and electrical second-order effects. Budget time for integrated leak detection calibration and protective relay reprogramming after energization.
Documentation
- Version-control P&ID revisions alongside firmware bundles.
- Archive torque and pressure test sign-offs for warranty audits.
- Train night shift on safe isolation sequences—blocks differ from single miners.
Charts packaged here are generic megawatt-row stories—not measured commissioning data.
Pricing & ordering
| Reference list price | $9,899.00 |
|---|---|
| Tiers, Incoterms & notes | Commercial terms: The list price shown here is a reference only. Volume tiers, Incoterms, payment milestones, factory lead times, and final serial-matched specs must come from your written quotation or distributor acknowledgement—not from third-party marketing pages. Performance charts: Add PNG, JPEG, WebP, or SVG exports (e.g. hashrate or efficiency vs. inlet temperature) under |
Specifications
| SKU | BM-55BB25CA5A |
|---|
Performance & curves
Reference charts bundled with this catalog folder. Open any image for full resolution; values are indicative until confirmed on your quote.
Operations & deployment
Plan rack or shelf loading, cable management, and thermal containment before arrival. Mining hardware ships at high density—verify floor loading, PDU headroom, and fire-system suitability with your building engineer. SHA-256 systems exhaust substantial heat; maintain cold-aisle discipline and staged firmware rollout on a bench host before production.
- Run burn-in on clean power with logging before joining high-value pools.
- Document serials, batch codes, and receipt photos for warranty and insurance.
- Maintain spare fans, cables, and controller boards where lead times are volatile.
Ordering, logistics & compliance
Commercial terms, Incoterms, VAT/GST treatment, and import classification are quoted per order. Freight may require fork-truck offload, liftgate service, or customs brokerage depending on lane and carton weight.
- Lead times and allocations change with fab schedules—confirm on the written order acknowledgement.
- End-use and sanctions screening may apply; customers are responsible for lawful deployment.
- Returns are handled per warranty policy; cosmetic tolerance varies by transport mode.
Support & warranty orientation
Manufacturer warranty windows, RMA paths, and advance replacement rules are defined on your invoice and manufacturer policy. Keep packaging for DOA claims when required.






Reviews
There are no reviews yet.